Skip to content
A dirt track running between cultivated fields under an open sky

Pipeline

21 projects
in development

Everything on this page is planned work. The figures are targets, not delivered capacity and not delivered carbon removal.

Portfolio totals

Planned, not delivered.

21

Projects in development

Projected

15+ rural mini grid sites and 6 industrial park sites.

1.4GW

Planned generation capacity

Projected

45 MW across rural mini grids, 1.35 GW across industrial sites.

1.6+million

Planned annual carbon removal capacity, tonnes CO2e

Projected

54,000 tonnes CO2e each year from mini grids, 1.5+ million each year from industrial parks.

Pipeline includes projects in development only. Additional projects are under evaluation. Project metrics are rounded. Carbon removal capacity is as published by Mandulis Energy, which states it is after buffer. Buffer pool and insurance arrangements are not yet specified in every project brief and will be fixed by the relevant registry at validation.

In development

The named projects.

The registry, methodology and listing year shown are what each project is being developed against, not a completed listing.

Northern Uganda Mini Grid and Carbon Removal Project

Northern Region, Uganda

Multiple 2.5 MW sites replicating the Got Ngur operating model across northern Uganda. Listing with Isometric is marked as coming soon.

Registry
Isometric
Methodology
Biochar Production & Storage v1.3
Status
PDD in development
Target listing
2026

U.N. Sustainable Development Goals

  • 1 No poverty
  • 2 Zero hunger
  • 7 Affordable and clean energy
  • 8 Decent work and economic growth
  • 13 Climate action
  • 15 Life on land

Bungu Mini Grid

Bungu Village, Nwoya District, Uganda

A 2.5 MW mini grid advancing towards registry listing, scaling our operating pilot at Got Ngur in the same district.

Registry
Puro.earth
Methodology
Biochar (2025)
Status
PDD in development
Target listing
2027

U.N. Sustainable Development Goals

  • 1 No poverty
  • 2 Zero hunger
  • 7 Affordable and clean energy
  • 8 Decent work and economic growth
  • 13 Climate action
  • 15 Life on land

Project briefs describe the standard and methodology each project is being developed under. Where a brief says a project is verified under a standard, that refers to the methodology being applied, not to completed third-party verification. Certification and issuance have not yet taken place, and no credits have been issued to date.

A site walk across the land adjoining the solar array

None of this is delivered capacity. Delivered results are reported on the projects page.

Why there is a pipeline

One proven site, repeated.

Each project repeats the model operating at Got Ngur: hybrid generation for a local network, agricultural residues as feedstock, and durable biochar as the carbon removal output.

Partner with us

Work with us on what comes next.

Discuss project development, investment opportunities and carbon credit offtake.